Didn’t:
1) leave space to add a 3rd lane in the future on both sides of the main east/west roads in SL county
2) continue i215 at the mouth of parleys running north and have it eventually meet up with i15 or downtown slc
3) build one road east/west that could eventually be a highway running east/west in the south part of the valley. (Not as far south as bangerter)
4) create a better way for bangerter highway and i215 to meet.
Some simple forward thinking and planning in those areas would make traveling in slc so much better.