Nov 12, 2023
4:09:17pm
Ssebo All-American
House Build Update 35B
I wanted to give you guys a quick update beyond what I posted earlier today with the video walkthrough post.

Since the last time I posted we have added sheetrock and done the beginning of the taping. It changes the way the house looks. It kind of shrinks the house when they put up sheet rock. We also put in a Cement pad in the front and by the back door and the back sliding door.

Other things I have been fighting is plumbing. I thought I was done with roughing in the plumbing, but then I charged the system before drywall and the showers were leaky. I decided it was the poor quality of the white thread tape. I went back and rebuilt everything in the showers, but I instead used blue monster tape, and that worked to seal things up really well.

Here are a couple of pictures.

Here is a picture looking in from the front door.
c1693a28447c93bccc2d3564c6b74718.jpeg

Here is a look from the back. I don't show very many of those
8c278f5e9cd5d006ca0c96b59baa86c7.jpeg

Here is the link to the video walkthrough from earlier today if you don't want to go back and find the earlier post.

https://www.youtube.com/watch?v=sX-PIqAxjrI
Ssebo
Bio page
Ssebo
Joined
Feb 2, 2007
Last login
May 20, 2024
Total posts
12,282 (635 FO)
Messages
Author
Time

Posting on CougarBoard

In order to post, you will need to either sign up or log in.