I imagine once it is all done I will be into it about 250 thousand. That includes the 24x32 shop.
But not the land. I have spent 202,000 so far, but I still have to pay for the furnace, the flooring, and I still have to pay about 10,000 between the sheet metal and drywall. Cabinets are going to be expensive too. About 20,000.