The tile went up all the way to the ceiling and we supplied the tile. Probably around 90 ft^2. Also included in that price was installing the tub, installing drywall, and re-doing some of the plumbing. I’m guessing he would have done the tiling for around $1000 if we had installed the tub, drywall and did the plumbing ourselves.