I explained to them I was going to do something about 3 or 4 times near the beginning of the call. At the end, one of them asks our project manager to ask me if I'm going to do that thing. First, why didn't he ask me? I was on the freaking call. Second, I had already said I was going to do that thing multiple times. Communicating with them is nearly impossible.