ChinaFan Intervention Needed
one part of the plans shows the offset, but another part is shown to grade. It was not pointed out during the final
plan review with the owner. (actually, the project team didn't notice it either, it wasn't found until the second CSA2 construction began, and they realized that the roads and parking areas were 0.30m below grade.)