It is going to look like we didn't do much today, but we actually finished the 2x6 planks across the top of the shop, I trenched in a PVC pipe for running electricity. A Dump Truck dropped off about 15 yards of Gravel and we moved about 14 of them into the Shed to level things out. We just used shovels and a wheelbarrow. Pretty huge work actually.
My Son's Shoveling some gravel at the end of the night. This has been really good for my son with Autism. He is the one in front.