Apr 17, 2023
7:47:22pm
Ssebo All-American
A lot of the engineering I have had done was done by the truss manufacturer. He is Local.
He knows that the Wind where I am exceeds 100 mph. and the snow load can be 2-3 feet. He planned the trusses to meet those specs. I also used the Cleary building that my dad had built in Northern Utah as a pattern for the bracing and the size of the boards. I am not sure that it will hold up to what it needs to. But it is a garage, and It will be insured. I am much more worried about trees falling on it than snow load collapsing it.
Ssebo
Bio page
Ssebo
Joined
Feb 2, 2007
Last login
May 17, 2024
Total posts
12,282 (635 FO)