Demolished the existing roof (wood shingles), down to the rafters. Put in mdf panels, substrate and shingles. One section at a time. Took 2 summer months.
This message has been modified
Originally posted on Jul 1, 2020 at 11:26:59am
Message modified by Everyman on Jul 1, 2020 at 11:28:38am