Mar 21, 2023
2:35:59pm
BillyGoat Contributor
How about tear down the ASB and put an underground parking garage there, then
build a new admin building above it. It is kind of a central location on campus and a good spot for another parking garage. They need 6 more buildings for Freshman housing and parking and still am not sure where those would fit unless they built them between Heritage halls 6 and 7 and the bell tower.
This message has been modified
Originally posted on Mar 21, 2023 at 2:35:59pm
Message modified by BillyGoat on Mar 21, 2023 at 2:41:44pm
BillyGoat
Bio page
BillyGoat
Joined
Apr 30, 2021
Last login
May 18, 2024
Total posts
1,017 (2 FO)
Messages
Author
Time

Posting on CougarBoard

In order to post, you will need to either sign up or log in.