Sign up, and you can make all message times appear in your timezone. Sign up
Mar 28, 2024
11:40:29am
Genghis Spreads Political Junky
Pat Gelsinger = Baghdad Bob?
Intel reported Microsoft as a client for their 18A node, which is equivalent to 1.8nm. Which would beat everybody, because Samsung and TSMC are only at 2nm.

But then his CFO said they're heavily relying on external foundries, and will keep doing so. If they can volume-produce 1.8nm with acceptable yields, why are they still outsourcing production?

Genghis Spreads
Previous username
BeefNoodleSoup
Bio page
Genghis Spreads
Joined
Feb 23, 2004
Last login
Apr 28, 2024
Total posts
33,892 (299 FO)