Apr 21, 2024
12:08:20pm
Schultz is back All-American
2100N will connect to Mountain View Corridor. MVC will become the frontage road
with a freeway in the middle. That's why there's so much space between directional lanes. They're starting the freeway right now as well as connecting MVC through past Porter Rockwell so you don't have turn in Porter Rockwell down to Redwood when headed south.
Schultz is back
Bio page
Schultz is back
Joined
Jan 14, 2013
Last login
Jun 1, 2024
Total posts
9,136 (842 FO)
Messages
Author
Time

Posting on CougarBoard

In order to post, you will need to either sign up or log in.