May 17, 2024
7:52:42pm
cougarfann888 Truly Addicted User
Just got a quote for my shop that I was hoping to build this summer. Anyone have
Experience not using a general contractor and subbing everything out myself? I don't know much about construction would that make it very difficult. I have the engineered plans already.

The general contractor is charging over 30k(18%) profit for his services in the bid we got.

I am going to get 1 or 2 more bids but it was way more than I was expecting. Doubt others come in much lower.
This message has been modified
Originally posted on May 17, 2024 at 7:52:42pm
Message modified by cougarfann888 on May 17, 2024 at 7:53:06pm
Message modified by cougarfann888 on May 17, 2024 at 7:55:26pm
Message modified by cougarfann888 on May 17, 2024 at 7:56:17pm
Message modified by cougarfann888 on May 17, 2024 at 7:56:33pm
Message modified by cougarfann888 on May 17, 2024 at 7:56:55pm
Message modified by cougarfann888 on May 17, 2024 at 7:57:11pm
cougarfann888
Bio page
cougarfann888
Joined
Oct 10, 2010
Last login
Jun 1, 2024
Total posts
27,881 (88 FO)
Messages
Author
Time

Posting on CougarBoard

In order to post, you will need to either sign up or log in.