Sign up, and you can make all message times appear in your timezone. Sign up
Oct 5, 2021
1:40:27pm
brick oven Playmaker
put the engineering students on it with a capstone project to design an
-automated cougar tail production line that could be run round the clock with very little human interaction.

-talk to the manufacturing department about how to improve throughput

-invest in new equipment if need be.

-if your production is not meeting demand then that's a management problem.

for example this piece of equipment can crank out 1320 dozen donuts/hour if a cougartail is equavalent to half a dozen donuts then that would be 220 tails/hour


now they might not need to go that big but maybe it's time to re-examine your process if you can't meet demand and not look to make excuses.
This message has been modified
Originally posted on Oct 5, 2021 at 1:40:27pm
Message modified by brick oven on Oct 5, 2021 at 1:40:55pm
Message modified by brick oven on Oct 5, 2021 at 2:19:48pm
brick oven
Previous username
Bleu cheese
Bio page
brick oven
Joined
Jun 24, 2008
Last login
Jan 8, 2022
Total posts
2,168 (5 FO)
Messages
Author
Time
10/5/21 1:06pm

Posting on CougarBoard

In order to post, you will need to either sign up or log in.