Orem city inspection passed!
Took 3 tries with the inspector. Just some nuances about the labeling and some panel interconnect wires that were dangling under the array.
Inspector never went on the roof or in the attic, never opened the inverter to inspect the wiring. Mostly just asked me questions about how I installed it and took my word for it.
Despite the return trips I was never charged anything additional for repeat inspector visits.
Tomorrow I submit the inspection report to Rocky Mountain Power and they will schedule a service call to replace my meter with a net meter. They said this should take 1-2 weeks. The meter swap itself takes about 2 minutes.
$9 power bills coming soon!