Sign up, and you'll be able to customize your font size and more! Sign up
May 21, 2019
12:34:36pm
Q-grr the missing puzzle piece
You could do a 12" cut out and place a couple of cantilevers above and set a backing
for your cut out repair. Then drill through the ceiling and thread some wires off your cantilevers to hang the rail. Not all in that order, but you get the gist.
Q-grr
Bio page
Q-grr
Joined
Dec 1, 2001
Last login
May 6, 2024
Total posts
21,464 (60 FO)
Messages
Author
Time

Posting on CougarBoard

In order to post, you will need to either sign up or log in.