Sign up, and you'll be able to customize your font size and more! Sign up
May 22, 2022
8:47:53am
The Pope All-American
The article highlights a lot of hurdles to clear for that to be a practical
reality. Technical, regulatory, operational, and economic rearrangements. Those are large barriers to success.

Existing plants have to undergo costly modifications (already an issue since cost recovery is what drives them to be baseloaded).

Financial and economic rearrangements means nuke plants have dozens of utility participants that are locked into partial ownership commitments that are years in length. And changes in have to be coordinated, agreed to, etc.

The article also highlights some of the flexibility operating metrics. Ramp rates that are 30+ minutes, hours long start ups in hot stand by. While those improvements highlight existing capabilities that should continued to be explored, they aren’t very good.

Gas plants can do the same in <10 minutes. Batteries can do it in seconds (I’m not a utility scale LiION storage fan at all for the record, just highlighting the challenges utility decision makers face). All cost less than nuke.

I’m all for SMR and other nuke advancements. But as a resource, it’s facing huge challenges to be a big part of the solutions.
The Pope
Previous username
Magyar_CougAZ
Bio page
The Pope
Joined
Dec 6, 2012
Last login
Apr 29, 2024
Total posts
7,549 (50 FO)
Messages
Author
Time

Posting on CougarBoard

In order to post, you will need to either sign up or log in.