Today we built the Pony Walls that hold up the I-joists. We also started the Moisture barrier that goes around the parts that will be under the ground up to where the Siding will start. I think tomorrow we will install the draining tubing around the foundation and cover it with washed 1 inch rock then fill in the big holes around the foundation. If the I joists show up I may start to install them tomorrow. We will see how it goes and if I can get a mini-excavator rented for tomorrow. I have to be honest, I am starting to get a little tired. These last two days have really been a whole lot of work. My wife is making me go to the Dentist tomorrow to get a filling replaced, so that will be a nice break. I told her I could probably just watch a few Videos and do it myself, but she says she has boundaries with DIY and that crosses one of them.
Here is a picture.