Two and a half months ago we poured footings, and it looks like tomorrow we will finally be "dried in." If it rains or snows or hails we are good.
I am particularly proud of my stairs I built today. Those things are actually a little more difficult than you would think. Lots of figuring out. Interestingly one of the things that is taking more time is closing up the space between the trusses. I have just been using scrap OSB. We have quite a bit of that stuff left to do.
My sheetmetal guy is way behind and it is looking like it will be quite a while before the outside is done. I thought about doing it myself like I did on the shop, but this is a little more complex, and I figured I better get someone who knows a little more about it.
I hope that you guys don't mind me posting all the time.
Here are a few pictures. I am going to include some pictures of the back sides of my house too. I really haven't done that very much.
My stairs.
Front (west) and South Side
North Side of the house, with a little bit of the Back (east)
Back view of the house. (East Side)